UAS-003-BIM-005 P02 — Antigravity (agy) Toolchain Custody, SOP and Prompt Library

Project: UAS Marquee 80 ft x 150 ft Working Drawings (UAS) · Fusion Developers
Owner: UAS-003 BIM Manager / Digital Delivery Lead · Revision P02 · Date 2026-08-05
Authority: UAS-DQD-004 P01 / FUS-2449 · Rollout FUS-2465 · Action FUS-2966

STATUS: PRELIMINARY - NOT FOR CONSTRUCTION. Method standard only. No engineering approval. All regulated content requires review and signature by a qualified local human professional.

Toolchain state (verified 2026-08-05)

ItemValue
agy binary~/.local/bin/agy v1.1.10
Model string (frozen)Gemini 3.6 Flash (High)
RendererGoogle Chrome headless --screenshot
Zero CDNMandatory - automatic reject on failure
UnitsFEET-INCHES (architectural)

Evidence pack required (E1-E6)

  1. E1 exact agy command line incl. model string
  2. E2 ls -l proof of absolute-path artefact
  3. E3 headless-Chrome screenshot path, non-blank
  4. E4 written vision/render finding
  5. E5 deployed Cloudflare Pages URL
  6. E6 Master Drawing Register entry ID, rev, purpose, status

Verification artefact

Custody smoke-test sheet (agy-built, zero CDN) · headless-Chrome render evidence PNG

No content, geometry or title-block data from the Qadirabad reference package or UAS-HR-100x200 is used. METHOD ONLY.